Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Feb 03, 2021     Holes for throttle quadrant cables - (1.9 hours)       Category: Fuselage
1. Researched, located and drilled two 1" holes for the throttle/mixture/prop control cables -- one on the forward side and one on the aft side of the gear tower.
2. Located and drilled a 3/8" hole in the aft side of the gear tower for the PTT and smoke switch wires on the throttle, plus the backup PTT button on the quadrant.
3. Began assembling the throttle quadrant.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.